How SemOS proves operating intelligence
SemOS separates scenario evidence, PoC evidence, pilot evidence, and verified operational evidence. Public materials show summaries only; detailed evidence may require NDA.
공개 요약 — 즉시 열람
Executive Brief — 요청 시 제공
NDA 검토 — 기밀 증거
내부 전용 — 공개되지 않음
not listed publicly
Proof maturity stages (S0–S5)
A clear split of what each stage supports — and what it does not mean.
S0 · Concept
S0A concept stage that frames the problem and the approach hypothesis.
S1 · Scenario Model
S1Expresses behavior and target metrics in a modeled scenario.
S2 · Internal Benchmark
S2A benchmark stage measured repeatedly on internal data/environments.
S3 · Controlled PoC
S3A controlled PoC within a scope agreed with a customer/partner.
S4 · Pilot / Operational Trial
S4A pilot operated in a real environment on a limited basis.
S5 · Third-Party Verified / Production Audited
S5The top stage: independent third-party verification or production audit.
Metric label standard (anti-overclaiming discipline)
Every public metric carries Baseline · Result · Period · Proof Stage · Limitation · Evidence Visibility.
Energy Cost Reduction
−6.2%- Baseline
- vs. baseline operation
- Period
- scenario window
- Proof Stage
- S1 · Scenario Model
- Evidence Visibility
- Executive Brief
SLA Maintained
99.99%- Baseline
- operating target
- Period
- scenario constraints
- Proof Stage
- S1 · Scenario Model (operating target)
- Evidence Visibility
- Public Summary
Evidence Traceable
100%- Baseline
- decision/execution logs
- Period
- evidence-model design coverage
- Proof Stage
- Design Coverage (evidence model)
- Evidence Visibility
- Executive Brief
Evidence review flow
Start from a public summary, then proceed to NDA / Executive Brief / PoC scope as needed.
12-element case structure
Every SemOS case is described with the same 12 public-safe elements.
The operating environment / industry
The operating problem being addressed
Allowed / prohibited execution scope
The assumption used as the comparison baseline
How it is structured and validated
Which of L1/L2/L3 · Evidence is involved
Category such as ALLOW/DERATE/HOLD/BLOCK (internal logic not disclosed)
Type of TXID evidence (sample)
Measured or expected result (with labels)
Openly disclosed constraints
Which S0–S5 stage
Evidence review / Executive Brief / PoC path
Case study 12-element structure
Public examples are scenario/sample-based unless explicitly marked otherwise, and do not imply customer deployment.
AI Data Center Energy Scenario (sample)
S1- Problem:
- Manage power/cooling cost and SLA simultaneously during AI load spikes.
- Baseline:
- vs. existing rule-based operation (scenario assumption).
- SemOS approach:
- Read power/cooling/facility state, check safety boundaries, then simulate approved actions with evidence.
ESS / Grid Service Scenario (sample)
S1- Problem:
- Balance revenue opportunity with safety/contract constraints when providing grid services (FR).
- Baseline:
- vs. fixed-schedule operation (scenario assumption).
- SemOS approach:
- Check asset state, contract, and safety boundaries, then simulate an ALLOW decision with execution evidence.
Enterprise Operating Readiness Scenario (sample)
S0- Problem:
- AI is adopted, but it is unclear whether org, data, authority, and KPIs are aligned for AI-operability.
- Baseline:
- current operating state (readiness-diagnostic baseline).
- SemOS approach:
- Map operating context and diagnose readiness and evidence gaps (2-week Readiness Review structure).