Proof Methodology

How SemOS proves operating intelligence

SemOS separates scenario evidence, PoC evidence, pilot evidence, and verified operational evidence. Public materials show summaries only; detailed evidence may require NDA.

Evidence visibility
Public Summary

공개 요약 — 즉시 열람

Executive Brief

Executive Brief — 요청 시 제공

NDA Review

NDA 검토 — 기밀 증거

Internal Only

내부 전용 — 공개되지 않음

not listed publicly

SemOS는 GTL Korea가 소유·운영하는 민간 플랫폼이며, 공공기관·정책기구가 아닙니다. 본 내용은 정보 제공 목적입니다.SemOS is a private platform owned and operated by GTL Korea. It is not a public institution or policy body. This content is provided for informational purposes.
Proof Stage S0–S5

Proof maturity stages (S0–S5)

A clear split of what each stage supports — and what it does not mean.

S0 · Concept

S0

A concept stage that frames the problem and the approach hypothesis.

Sharing direction, hypothesis, and design intent.
Does not imply measured results or implementation validation.
Concept summary and positioning.
None (public concept).
Hypothesis stage; results are not guaranteed.

S1 · Scenario Model

S1

Expresses behavior and target metrics in a modeled scenario.

Demonstrating operating flow, target metrics, and safety boundaries.
Not real-data results or production outcomes.
Scenario summary and demo.
Detailed model assumptions and parameters.
Scenario-based figures, not an operating guarantee.

S2 · Internal Benchmark

S2

A benchmark stage measured repeatedly on internal data/environments.

Repeatability and trend comparison under internal conditions.
Not customer-environment results or independent verification.
Benchmark method summary.
Internal datasets and measurement detail.
Results are limited to internal conditions.

S3 · Controlled PoC

S3

A controlled PoC within a scope agreed with a customer/partner.

Operability and evidence generation in a real scenario.
Does not imply continuous operation or production results.
PoC structure and deliverable summary.
PoC detail data, Evidence Pack, and results.
Results are within the controlled scope and are not generalized.

S4 · Pilot / Operational Trial

S4

A pilot operated in a real environment on a limited basis.

Reviewing durability and governance under operating conditions.
Not full production or third-party certification.
Pilot scope and governance summary.
Pilot operating data and transition plan.
Limited-operation results, not a full guarantee.

S5 · Third-Party Verified / Production Audited

S5

The top stage: independent third-party verification or production audit.

Trust based on independent verification/audit.
Current public metrics are NOT claimed at this stage.
If achieved, public scope is agreed with the verifier.
Audit/verification detailed reports.
SemOS does not currently claim this stage.
Metric Label Standard

Metric label standard (anti-overclaiming discipline)

Every public metric carries Baseline · Result · Period · Proof Stage · Limitation · Evidence Visibility.

BaselineResultPeriodProof StageLimitationEvidence Visibility

Energy Cost Reduction

−6.2%
시뮬레이션 예시값 (Demo Scenario)
Baseline
vs. baseline operation
Period
scenario window
Proof Stage
S1 · Scenario Model
Evidence Visibility
Executive Brief
Limitation: A public-demo / scenario-scope result, not a production guarantee.
Request Executive Brief under NDA

SLA Maintained

99.99%
시뮬레이션 예시값 (Demo Scenario)
Baseline
operating target
Period
scenario constraints
Proof Stage
S1 · Scenario Model (operating target)
Evidence Visibility
Public Summary
Limitation: An operating target / scenario benchmark, not a production guarantee.
Request Evidence Review

Evidence Traceable

100%
시뮬레이션 예시값 (Demo Scenario)
Baseline
decision/execution logs
Period
evidence-model design coverage
Proof Stage
Design Coverage (evidence model)
Evidence Visibility
Executive Brief
Limitation: Evidence-model design coverage, not a third-party audit.
Request Executive Brief under NDA
Evidence Review Flow

Evidence review flow

Start from a public summary, then proceed to NDA / Executive Brief / PoC scope as needed.

1Review public summary
2Request evidence review
3NDA if required
4Executive Brief
5PoC / pilot scope
Case Study Template

12-element case structure

Every SemOS case is described with the same 12 public-safe elements.

1Context

The operating environment / industry

2Problem

The operating problem being addressed

3Operating boundary

Allowed / prohibited execution scope

4Baseline assumption

The assumption used as the comparison baseline

5Scenario / PoC design

How it is structured and validated

6SemOS layer involved

Which of L1/L2/L3 · Evidence is involved

7Decision logic category

Category such as ALLOW/DERATE/HOLD/BLOCK (internal logic not disclosed)

8Evidence generated

Type of TXID evidence (sample)

9Result / expected result

Measured or expected result (with labels)

10Limitation

Openly disclosed constraints

11Verification stage

Which S0–S5 stage

12Next action

Evidence review / Executive Brief / PoC path

Case Study Structure

Case study 12-element structure

Public examples are scenario/sample-based unless explicitly marked otherwise, and do not imply customer deployment.

AI Data Center Energy Scenario (sample)

S1
Data center / infrastructure operations reviewers
Problem:
Manage power/cooling cost and SLA simultaneously during AI load spikes.
Baseline:
vs. existing rule-based operation (scenario assumption).
SemOS approach:
Read power/cooling/facility state, check safety boundaries, then simulate approved actions with evidence.
L2L3Evidence
A TXID evidence sample for a DERATE decision (placeholder hash).
시뮬레이션 예시값 (Demo Scenario)−6.2% Energy Cost Reduction · S199.99% SLA Maintained · S1
A public-demo / scenario-scope result; it does not imply production performance.

ESS / Grid Service Scenario (sample)

S1
Energy / power / VPP operations reviewers
Problem:
Balance revenue opportunity with safety/contract constraints when providing grid services (FR).
Baseline:
vs. fixed-schedule operation (scenario assumption).
SemOS approach:
Check asset state, contract, and safety boundaries, then simulate an ALLOW decision with execution evidence.
L2L3Evidence
A TXID evidence sample for an ALLOW decision (placeholder hash).
시뮬레이션 예시값 (Demo Scenario)100% Evidence Traceable · S1
A scenario-based example; it does not guarantee real grid/contract outcomes.

Enterprise Operating Readiness Scenario (sample)

S0
Enterprise executives / operating leaders
Problem:
AI is adopted, but it is unclear whether org, data, authority, and KPIs are aligned for AI-operability.
Baseline:
current operating state (readiness-diagnostic baseline).
SemOS approach:
Map operating context and diagnose readiness and evidence gaps (2-week Readiness Review structure).
L1Evidence
Operating context map and evidence gap list (sample deliverables).
A diagnostic/design deliverable; results are not guaranteed and it does not imply customer deployment.